You're seeing this page as if you were . The main menu is still yours, though. Exit from immersion
Joan SánchezJS

Joan Sánchez

Project Manager / EPC / Oil&Gas

250 €/día
Madrid, ES
8-15 años

Tiempo medio de respuesta: 1h

Acerca de Joan

More than 14 years experience in the Oil&Gas industry, O&M and EPC worldwide
construction projects.
Objective driven, international experience (more than five years in different
countries such as Czech Republic, Egypt or Finland), fluent in English and Spanish,
Flexible and adaptable, good leadership abilities, and many other soft skills that
make me a good candidate to help you reach your goals in your organization.

If you think that I could help you, consider my profile and let's talk!
  • Español

    Bilingüe o nativo

  • Inglés

    Bilingüe o nativo

Acepta trabajo presencial
Madrid (hasta 50 km), Alicante (hasta 100 km), Valencia (hasta 100 km), Cartagena (hasta 100 km), Barcelona (hasta 50 km)

Experiencia

  • Tecnicas Reunidas
    Project engineer
    marzo de 2020 - Hoy (6 años y 3 meses)
    Madrid y alrededores, España
    TECHNICAL DIRECTOR. Bidding of a new Battery grade lithium Mine, for Rio Tinto in Serbia, JADAR project. Budget 1000 MM€ TECHNICAL DIRECTOR. Bidding of a new Delayed coker unit for Gazpromneft Moscow Refinery Project budget 350 MM€ - Responsible of all thechnical disciplines in order to prepare a bid according to the client requirements and specifications - Technical documentation preparation - Value Engineering coordinator VALUE ENGINEERING COORDINATOR. Bidding of a new Hydrocracker and hydrogen Generation unit for Gazpromneft Moscow Refinery Project Budget 400 MM€
  • FCC Industrial
    Project Engineer. Oil&Gas EPC Projects
    febrero de 2012 - enero de 2020 (7 años y 11 meses)
    Madrid Area, Spain
    As project engineer my role involves different tasks and responsabilites, depending on the project I am assigned to, they can go from Procurement leader to commissioning supervisor on site, engineering supervisor, or even preparing quotations for new projects. This diversity has given me a great overall view of how an EPC project is developed and thus the capacitiy to work in any position. 2016 - 2019. Dublin airport Fuel storage facility (fuel farm) and hydrant pipeline. EPC project. (Dublin, Ireland) - Accountable for all mechanical/electrical equipments procurement phase - Expediting and supervising vendors during manufacturing/FAT of the equipments . - Engineering supervisor - Technical advisor during commissioning and start up phase. *Project budget 33 MM€* 2014-2016 EPC project, LNG storage tank (Pori, Finland) - Accountable for all mechanical equipments procurement phase - Expediting and supervising vendors during manufacturing of the equipments (LNG pumps, cryogenic valves, prefabricated steel structure...) - Mechanical erection/commissioning/start up supervisor on site. - Responsible for warranty issues after start up *Project Budget 30 MM€* 2012 -2014 CSP Thermosolar power plant EPC project (Alicante, Spain) - Expediting and supervising the manufacturing of the mechanical equipments (static & rotating) - Supervising the engineering and vendors, reviewing technical documentation (drawings, manufacturing procedures, inspection plan programs, etc). - Ensuring the equipments are delivered to the construction site just in time, with no delays. - Responsible for the mechanical erection of the equipments in the construction site. - Responsible for the commissioning and start up of the equipments. - Responsible for the budget of the assigned contracts (10 MM €): high pressure feed water pumps, HTF pumps, steam generation system, expansion vessels, small pumps, small pressure vessels, heat exchangers. *Project Budget 250 MM€*
  • SEGAS LNG [Damietta Liquefaction facility]
    Reliability & Predictive Maintenance Engineer
    febrero de 2008 - abril de 2011 (3 años y 2 meses)
    Damietta Governorate, Egypt
    – In charge of the predictive and preventive maintenance plan in a LNG (liquefaction) plant – Vibration analysis in rotating equipment and steel structures. Early detection of failures in pumps, compressors, turbines, air fan coolers etc.. – Thermal imaging in rotating equipment and electrical switchgears to early detect failures – Leading a team of up to 20 technicians. – Updating the maintenance procedures, as well as keeping updated the CMMS (computerized maintenance management system) – Ensure stock of key spare parts in the warehouse. – RCM (reliability centered maintenance) implementation project – Planning and executing the tasks assigned during the Major annual Shutdown – Deep knowledge of LNG process, as well as the equipments of the liquefaction process (gas turbines, compressors, turbo expander, centrifugal pumps, heat exchangers) as well as the utilities (Nitrogen plant, power generation, instrument air, desalination plant, waste water unit, heat exchangers, fire fighting system...)

Recomendaciones

Sé el primero en recomendar a Joan

Ayuda a este freelance a destacar compartiendo tu experiencia.

Estos perfiles de freelance también coinciden con tus criterios

AgathaA

Agatha Frydrych

Backend Java Software Engineer

4.7

(3)

2

BaptisteB

Baptiste Duhen

Fullstack developer

4.6

(4)

5

AmedA

Amed Hamou

Senior Lead Developer

4

(2)

7

AudreyA

Audrey Champion

Web developer

4.3

(3)

4

Formación

  • Ingeniero Industrial
    Universidad Miguel Hernández de Elche
    2006
    Final project, Predictive maintenance program in an aluminum cold rolling factory, Excelent (10/10)
  • Ingeniero Industrial
    České vysoké učení technické v Praze - ČVUT
    2005

Conjunto de habilidades profesionales (48)

Categorías