Acerca de Dorian
Francés
Bilingüe o nativo
Español
Competencia profesional básica
Inglés
Competencia profesional completa
Experiencia
- Rubis PhotosolGrid Project Manager – Photovoltaic & BESSenero de 2024 - abril de 2025 (1 año y 3 meses)• Interconnexion RequestsTSO:Sanilhac, France – Solar PV – 160 MWp (120 MW) – 225 kV – Development phaseDesigned single-line diagram, supported substation land negotiations, submitted grid connection requests to RTE (TSO), tracked milestone payments to secure grid capacity, and estimated routing and connection costs.DSO:Salbris, France – Solar PV – 74.5 MWp (63 MW) – 20 kV – Ready to BuildCompared DSO vs. TSO connection strategies. Analyzed costs, delays, and risks. Proposed securing extra capacity for future projects. Sized both solutions and sourced quotes for a 90/33 kV substation.Hottviller, France – BESS – 32 MW (64 MWh) – 20 kV – DevelopmentElectrical sizing and diagram completed. Submitted DSO connection request. Supported procurement for batteries, transformers, and inverters.• Commissioning & WorksMonitored electrical studies and connection works with ENEDIS (DSO).Negotiate easement agreement with private landlord.Coordinated commissioning teams (automation, electrical, ENEDIS).Installed and tested DEIE and meters in delivery cabins, activated centralized inverters, installed decoupling protections on existing grid.Sites: Creil (201 MWp), Bellac (19.8 MWp), Allemand (300 kWp new technologies) , Gauterie (16.2 MWp), La Rochefoucauld (5 MWp)• Italy- Fiano (12 MWp), Viterbo (6 MWp), Campagnano (10 MWp)Reviewed TICAs for our Ready-to-Build projects, analyzed subcontractor grid connection offers. Evaluated ENEL vs. internal subcontracting cost. Supported routing negotiations.• Interconnexion Strategy- Analyzed S3REnR grid planning revisions to anticipate future works by the DSO and TSO.- Provided business development management with strategic zones for land prospecting.- Carried out exploratory studies to evaluate availability on the transmission grid.- Met with local energy unions to align network upgrades with our project locations.
- Vinci EnergiesEV Charging (IRVE) Project Managermayo de 2023 - octubre de 2023 (5 meses)Paris, France• Led 45 EV (150 kW) charging infrastructure projects + battery systems.• Supervised on-site civil and electrical works, oversaw budgets and commissioning.• Managed national clients and contractors across France.• Interconnexion requests and following the connexion works.
- Hospital "Foch"Independent Flutter Developer – Lung Graft Testing Interfacemarzo de 2023 - julio de 2023 (4 meses)Paris, France• Developed a local mobile interface using Flutter to collect and display real-time data from a lung graft testing machine.• Enable secure data transmission for medical teams.• Worked closely with surgeons to ensure system integration and reliability.
Reseñas
Recomendaciones
Estos perfiles de freelance también coinciden con tus criterios
Agatha Frydrych
Backend Java Software Engineer
4.7
(3)
2
Baptiste Duhen
Fullstack developer
4.6
(4)
5
Amed Hamou
Senior Lead Developer
4
(2)
7
Audrey Champion
Web developer
4.3
(3)
4
Formación
- Master's Degree in Electrical and Energy EngineeringESME Sudria Engineering School2023Master's Degree in Electrical and Energy Engineering
- Exchange Program – Electrical EngineeringFESB, University of Split2022Exchange Program – Electrical Engineering